联系我们
快盈11v
联系人:林经理
电话:快盈11v151 6888 2846
邮箱:快盈11v527800164@qq.com
地址:济南市历下区化纤厂路8号3号楼101号
卷帘门安装要求及安装步骤内容
来源:http://xl0475.com 日期:2022-12-03 发布人:
卷帘门通常适用于门面、、医院、工厂、车库等门洞较大的场所,那么你了解卷帘门安装要求及安装步骤内容吗?下面济南卷帘门厂家为您讲解。
Rolling shutter doors are usually applicable to places with large door openings such as doors, shopping malls, hospitals, factories and garages. Do you know the installation requirements and steps of rolling shutter doors? Next, Jinan roller shutter door manufacturer will explain it to you.
1、先复核门洞的尺寸是否与制作尺寸规格相符。
1. First, check whether the size of the door opening is consistent with the manufacturing size.
2.将端盖板用膨胀螺丝或其它方式与墙体固稳,端盖板外边距洞口边不能小导轨宽度,应比导轨宽Smm左右,保证与墙体垂直,两端盖板平行宽度与高度应与制作尺寸一致,允许误差。
2. Fix the end cover plate with the wall by expansion screws or other methods. The distance from the outer edge of the end cover plate to the hole edge shall not be smaller than the width of the guide rail, which shall be about Smm wider than the guide rail to ensure that it is perpendicular to the wall. The parallel width and height of the cover plates at both ends shall be consistent with the manufacturing size, with allowable errors.
3、用水平管测两端盖板对是否平行,误差#2毫米。
3. Use a horizontal pipe to measure whether the center of the cover plates at both ends is parallel to the center, with an error of # 2mm.
4、将导轨用螺丝与墙体固定,保证与端盖板边、洞口边平齐,用铅锤吊线检测垂直度,误差#2毫米。导轨之间的距离应平行相等,误差#3毫米。将门轴或门体装在两端盖板上固定。再用水平尺和水平管检测是否水平,误差#2毫米。
4. Fix the guide rail with the wall with screws to ensure that it is flush with the edge of the end cover plate and the edge of the hole. Use a plumb bob to check the perpendicularity, with an error of # 2mm. The distance between guide rails shall be parallel and equal, with error # 3mm. Fix the door shaft or door body on the cover plates at both ends. Then use a level ruler and a horizontal tube to check whether it is horizontal, with an error of # 2mm.
6、调整上下限位,门在运行中应流畅无异常响声。所有启动方式都应检测试用。
6. Adjust the upper and lower limit, and the door shall be smooth without abnormal noise during operation. All starting methods shall be tested and tried.
7.将罩壳和扣板装好,护帽和堵头装好后应将现场和门卫生清理。
7. Install the cover and gusset plate, and clean the site and door after installing the protective cap and plug.
8.按公司要求与客户办理有关结账收款事宜。并及时将情况与有关部门汇投。
8. Handle settlement and collection matters with customers as required by the company. And timely report the situation to relevant departments.
此外要知道在国内卷帘门的尺寸并没有统一的标准,卷帘门的大小及卷帘门门片的大小厚度都可以根据具体情况,按照客户的要求及实际测量门洞的大小来确定卷帘门的尺寸。你有需求就来关注我们网站http://xl0475.com并进行相应的联系吧!
In addition, we should know that there is no uniform standard for the size of roller shutter doors in China. The size of roller shutter doors and the size and thickness of roller shutter door panels can be determined according to the specific situation, the customer's requirements and the actual measurement of the size of the door opening. Follow our website if you need http://xl0475.com And make corresponding contact!
下一篇:卷帘门定期检查的地方有哪些 上一篇:防火卷帘门安装要安装电控箱锁盒吗?
阅读/ Recommended reading
- 防火卷帘门分几种类别? 2024-06-06
- 防火卷帘门对于企业的使用有哪些? 2024-06-09
- 济南卷帘门:卷帘门的工作原理以及工作过程 2024-05-23
- 济南卷帘门:如何调节卷帘门限位? 2024-05-17
- 济南卷帘门:电动卷帘门的优势有哪些? 2024-05-15
- 济南卷帘门:电动卷帘门遥控器相关知识介绍 2024-05-11
- 济南卷帘门:卷帘门的用处有哪些? 2024-05-08
- 防火卷帘门保护装置特点 2024-04-18
车库门出现故障怎么办?
2024-06-12
快盈11v一、查看线路1、 View routes就是在使用这类产品的时候,如果出现了故障,那么应该注意的就是对于整个产品的情况的检查与了解,因为有的时候可能出现的问题并不是整个门真...