快盈11v

快盈11v网站 在线留言 联系我们

服务咨询热线

151 6888 2846

热门关键词: 水晶折叠门 水晶卷帘门 抗风卷帘门

行业新闻

首页>>新闻资讯>>行业新闻几种常见的卷帘门安装步骤
联系我们
快盈11v

联系人:林经理

电话:151 6888 2846

邮箱:527800164@qq.com

地址:济南市历下区化纤厂路8号3号楼101号

几种常见的卷帘门安装步骤

来源:http://xl0475.com 日期:2022-08-25 发布人:
济南卷帘门成为很多家庭使用的门,伸缩方便,节省空间,应用范围非常广。而且卷帘门的种类也越来越多了,那么卷帘门怎么安装呢?在本文中就为大家介绍几种常见的卷帘门安装步骤。
Jinan roller shutter door has become a door used by many families. It is easy to expand and retract, saves space, and has a wide range of applications. And there are more and more kinds of roller shutter doors. How to install roller shutter doors? In this article, we will introduce several common installation steps of roller shutter door.
电动卷帘门安装步骤:
Installation steps of electric roller shutter door:
1、先在需要安装的门框框口位置画出线。表明尺寸大小,然后找工作人员设计出合适的电动卷帘门,这里值得注意的一点是框内高度比门扇的高度要高一点点。
1. Draw the line at the door frame opening to be installed. Indicate the size, and then find the staff to design a suitable electric roller shutter door. What is worth noting here is that the height of the frame is a little higher than the height of the door leaf.
2、先把电动卷帘门的门框固定,这里要先拆掉门框下部的固定板。
2. First fix the door frame of the electric roller shutter door. Here, remove the fixing plate at the lower part of the door frame.
3、安装电动卷帘门扇主体门扇。一定要保证电动卷帘门与墙体结成整体,封闭性要做好,再粉刷洞口及墙体。粉刷完毕后,门缝应均匀平整,开启电动卷帘门应该自由轻便,不得有过紧、过松和反弹现象。
3. Install the main door leaf of the electric roller shutter door leaf. Make sure that the electric roller shutter door and the wall form a whole, and the sealing shall be done well, and then paint the opening and the wall. After painting, the door seam shall be even and flat. The electric roller shutter door shall be free and light to open, and shall not be too tight, too loose or rebound.
防火卷帘门安装步骤:
Installation steps of fireproof rolling shutter door:
1、按设计型号,查阅产品说明书和电气原理图。
1. Refer to the product manual and electrical schematic diagram according to the design model.
2、测量洞口标高,弹出两导轨垂线及卷筒线。
2. Measure the elevation of the hole, and snap the vertical lines of the two guide rails and the center line of the drum.
3、将垫板电焊在预埋铁板上,用螺丝固定卷筒的左右支架,安装卷筒。卷筒安装后应转动灵活。
3. Weld the backing plate on the embedded iron plate, fix the left and right supports of the drum with screws, and install the drum. The drum shall rotate flexibly after installation.
4、安装减速器和传动系统。
4. Install the reducer and drive system.
5、安裳电气拴街系统。
5. Anshang electric street system.
6、空载试车。
6. No load test run.
7、将事先装配好的帘板安装在卷筒上。
7. Install the curtain plate assembled in advance on the drum.
8、安装导轨。按图纸规定位置,将两侧及上方导轨焊牢于墙体预埋件上,并焊成以体,各导轨应在同一垂直平面上。
8. Install the guide rail. According to the positions specified in the drawings, the guide rails on both sides and above shall be welded to the embedded parts of the wall and welded into a body. Each guide rail shall be on the same vertical plane.
9、安装水幕喷淋系统,并与总控制系统连接。
9. Install the water curtain spraying system and connect it with the general control system.
10、试车。先用手去试运行,再用电动机启闭数次,调整无卡住、阻滞及异常。
10. Test run. Test run by hand first, and then open and close the motor for several times until there is no jam, block and abnormality.
自动门水晶卷帘门安装步骤:
Installation steps of automatic door crystal roller shutter:
1、先看手动链条是否向下,在将电机固定在主板上,在把链条固定在轮盘和电机底座齿轮连接(一定上紧)在将遥控接线盒与电机连接,试下手柄是否颠倒,如颠倒遥控接收盒侧方有黑色按键,向另一方拨动助即可。
1. First, check whether the manual chain is down. After fixing the motor on the main board, after fixing the chain on the wheel plate and connecting the motor base gear (tighten it), and after connecting the remote control junction box with the motor, try whether the handle is reversed. If there is a black button on the side of the reverse remote control receiving box, just move it to the other side.
济南卷帘门
2、用尺子量主板和副板的外边看下尺寸是否正确,如正确把轴上在侧板上,注意要先把轴打一条水平线,再用10个钻头打孔50公分,1个一定要直,再用14的镙母焊在轴上,记住要与轴上的孔垂直在焊,一定要焊牢固,再把帘子的片的与轴上的孔对齐用10个的钻头打孔一定要垂直(也可以用快丝固定)。
2. Use a ruler to measure the outer edges of the main board and the auxiliary board to see if the dimensions are correct. If the shaft is correctly placed on the side plate, pay attention to striking a horizontal line on the shaft first, then drill 50 cm with 10 drills, and one must be straight. Then weld the shaft with 14 screws. Remember to weld vertically with the hole on the shaft, and be sure to weld firmly, Then align the center of the first piece of the curtain with the hole on the shaft, and use 10 drill bits to drill holes, which must be vertical (or fixed with fast wire).
3、在将卷帘门帘片穿好两侧用封头封好用拉铆钉拉住(记住开始封各一片封一个)。
3. Seal the two sides of the rolling shutter door curtain with heads and pull them with rivets (remember to seal one piece at the beginning).
4、封完后用绳翻过轴把帘子打个孔一头一个用绳拴住,别一端用人拽住,按下手柄的上升键,使轴运行将帘子带上去,镙丝杆把帘子和轴连在一起(水平要拧紧加垫)再把帘子升上去,一定要牢固。
4. After sealing, use a rope to turn over the shaft to make a hole for the curtain, one end of which is tied with a rope, and the other end is held by a person. Press the up button of the handle to make the shaft run to bring the curtain up. The screw rod connects the curtain and the shaft together (the horizontal screw should be tightened and padded), and then the curtain should be lifted up firmly.
5、把轨道的一端开成人字口。
5. Open one end of the track into a slot.
6、把卷帘门帘子调平,上下线定位,左边滑轮是上限位,右边是下限位,(根据现场需要自行调节)。
6. Level the curtain of the roller shutter door, and position the upper and lower lines. The left pulley is the upper limit and the right pulley is the lower limit. (adjust it according to the needs of the site).
以上就是关于“几种常见的卷帘门安装步骤”的全部内容,希望能对大家有所帮助。还有更多类型的卷帘门内容值得了解,来我们网站http://xl0475.com咨询更多吧!
The above is all about the "installation steps of several common rolling shutter doors". I hope it can help you. There are more types of roller shutter doors worth knowing. Come to our website http://xl0475.com Ask more!

阅读/ Recommended reading

一、查看线路1、 View routes就是在使用这类产品的时候,如果出现了故障,那么应该注意的就是对于整个产品的情况的检查与了解,因为有的时候可能出现的问题并不是整个门真...

防火卷帘门分几种类别? 2024-06-06
防火卷帘门对于企业的使用有哪些? 2024-06-09
济南卷帘门:卷帘门的工作原理以及工作过程 2024-05-23
济南卷帘门:如何调节卷帘门限位? 2024-05-17
济南卷帘门:电动卷帘门的优势有哪些? 2024-05-15
济南卷帘门:电动卷帘门遥控器相关知识介绍 2024-05-11
济南卷帘门:卷帘门的用处有哪些? 2024-05-08
防火卷帘门保护装置特点 2024-04-18